EATS | 06-1 | 1984 | Issue 2 | OVERHEAD LINES | Safety belts, harness and associatedequipment | ||||||||||
EATS | 09-1 | 1970 | Issue 1 | CABLES | Lead sleeves for electric cables(metric units) | Ian Naylor | ASG | ||||||||
EATS | 09-2 | 2003 | Issue 4 | CABLES | Specification for the supply, delivery & installation of power cables with operating voltages in the range 33kV to 400kV and associated auxiliary cables | Ian Naylor | ASG | ||||||||
EATS | 09-3 | 1982 | Issue 2 | CABLES | 33kV impregnated paper insulated oil-filled and gas-pressure type power cable systems | Ian Naylor | ASG | ||||||||
EATS | 09-4 | 1991 | Issue 3 | CABLES | 66kv and 132KV impregnated paper insulated oil-filled and gas-pressure type power cable systems | Ian Naylor | ASG | ||||||||
EATS | 09-5 | 1991 | Issue 3 | CABLES | 275 and 400kV impregnated paper insulated, oil-filled and gas compression type power cable systems | Ian Naylor | ASG | ||||||||
EATS | 09-6 | 1988 | Issue 6 | CABLES | Auxiliary multicore and multipair cables | Ian Naylor | ASG | ||||||||
EATS | 09-7 | 1999 | Issue 5 | CABLES | PVC and XLPE Insulated Concentric Services with Stranded Copper or Solid Aluminium Phase Conductors and Copper Concentric Neutral Conductors | Ian Naylor | ASG | ||||||||
EATS | 09-8 | 1977 | Issue 4 | CABLES | Impregnated paper insulated 600/1000 volt cable with three solid aluminium phase conductors and aluminium sheath/neutral conductor (Consac) | Ian Naylor | ASG | ||||||||
EATS | 09-9 | 1981 | Issue 5 | CABLES | Polymeric insulated, combined neutral/earth (CNE) cables with solid aluminium phase conductors and concentric aluminum wire waveform neutral/earth conductors | Ian Naylor | ASG | ||||||||
EATS | 09-10 | 1999 | Issue 2 | CABLES | Porcelain insulators for 33, 66, 132, 275 and 400kV cable outdoor sealing ends | Ian Naylor | ASG | ||||||||
EATS | 09-11 | 1975 | Issue 1 | CABLES | Heat shrinkable insulated materials for use with 600/1000V cables and accessories | Ian Naylor | ASG | ||||||||
EATS | 09-12 | 1990 | Issue 2 | CABLES | Impregnated paper insulated corrugated aluminium sheathed 6350/11 000 volts cable | Ian Naylor | ASG | ||||||||
EATS | 09-13 | 1981 | Issue 1 | CABLES | Performance specification for high voltage heat shrinkable components for use with high voltage solid type cables up to and including 33 000 volts, Issue 1, 1981 | Ian Naylor | ASG | ||||||||
EATS | 09-15 | 1989 | Issue 2 | CABLES | Jointing instructions and procedures for mass impregnated and mass impregnated non-draining paper insulated 19/33kV cables Part 1: Jointing instructions. Part 2: Jointing Procedures | Ian Naylor | ASG | ||||||||
EATS | 09-16 | 1983 | Issue 1 | CABLES | Testing specification for metallic sheathed power cables with extruded cross-linkedPolyethylene insulated and accessories for system voltages of 66kV and 132kV | Ian Naylor | ASG | ||||||||
EATS | 09-17 | 1991 | Issue 2 | CABLES | Single core cables for use in substations having extruded insulation and rated voltages of 6350/11 000 volts, and 19 000/33 000 volts | Ian Naylor | ASG | ||||||||
EATS | 09-19 | 1996 | Issue 2 | CABLES | Synthetic aromatic hydrocarbon insulating fluid for use in fluid-filled pressure-assisted cables up to 400kV operating voltage | Ian Naylor | ASG | ||||||||
EATS | 09-20 | 1990 | Issue 1 | CABLES | Single core cable having cross linked polyethylene insulation and lead sheath for rated voltage 19 000/33 000 volts (Um=36 000 volts) | Ian Naylor | ASG | ||||||||
EATS | 09-21 | 1990 | Issue 1 | CABLES | Cross-linked polymeric insulated triplex cables for a rated voltage of 6350/11 000 volts (Um=12 000V) | Ian Naylor | ASG | ||||||||
EATS | 09-22 | 1997 | Issue 1 | CABLES | Protection of cable installations against the effects of fire | Ian Naylor | ASG | ||||||||
EATS | 12-1 | 1970 | Issue 1 | CONTROL | Terminal blocks WITHDRAWN | WITHDRAWN | TS 50-18 | ||||||||
EATS | 12-2 | 1970 | Issue 1 | CONTROL | Electrical terminations WITHDRAWN | WITHDRAWN | TS 50-18 | ||||||||
EATS | 12-3 | 1992 | Issue 3 | METERING | Outdoor meter cupboards | Ian Naylor | ASG | ||||||||
EATS | 12-4 | 1973 | Issue 1 | CABLES | Terminating equipment for pilot cables subject to induced transient voltages exceeding 650V rms | Ian Naylor | ASG | ||||||||
EATS | 12-5 | 1989 | Issue 2 | Indicating lamps - filament type | Ian Naylor | ASG | |||||||||
EATS | 12-6 | 1973 | Issue 1 | Time fuse-links (for use with current transformer releases on circuit-breakers) | Ian Naylor | ASG | |||||||||
EATS | 12-7 | 1972 | Issue 1 | Basic shapes for control handles WITHDRAWN | WITHDRAWN | TS 50-18 | |||||||||
EATS | 12-8 | 1986 | Issue 2 | The application of fuse-links to 11kV/415V and 6.6/415V underground distributionnetworks | Ian Naylor | ASG | |||||||||
EATS | 12-9 | 1980 | Issue 2 | Wiping glands for metallic-sheathed cables | Ian Naylor | ASG | |||||||||
EATS | 12-10 | 1990 | Issue 2 | Single phase domestic cut-outs, connector blocks and interconnecting units up to 100A rating WITHDRAWN | WITHDRAWN | BS 7657: 1993 | |||||||||
EATS | 12-11 | 1981 | Issue 2 | Indoor and outdoor cable boxes for switchgear for service at system nominal voltages of 6.6, 11 and 33kV | Ian Naylor | ASG | |||||||||
EATS | 12-12 | 1999 | Issue 2 | Compounds for use in 3kV accessories for mind oil-rosin paper insulated cables | Ian Naylor | ASG | |||||||||
EATS | 12-14 | 1976 | Issue 1 | Impregnated crepe paper for cable jointing in solid type cable accessories | Ian Naylor | ASG | |||||||||
EATS | 12-15 | 1978 | Issue 1 | Weak-back ferrules for electric power cable jointing on solid-type cables up to and including 11kV | Ian Naylor | ASG | |||||||||
EATS | 12-16 | 1978 | Issue 1 | Fuse-switch trip testing devices WITHDRAWN | WITHDRAWN | TS 41-26 | |||||||||
EATS | 12-18 | 1980 | Issue 1 | Polyester resin/glass fibre protection boxes and protective shrouds for oil-filled and gas-pressure cable accessories | Ian Naylor | ASG | |||||||||
EATS | 12-19 | 1982 | Issue 1 | Single phase street lighting cut-outs - 25A rating WITHDRAWN | WITHDRAWN | BS 7654: 1993 | |||||||||
EATS | 12-20 | 1984 | Issue 1 | Low voltage pole-mounted fuses WITHDRAWN | WITHDRAWN | BS 7657: 1993 | |||||||||
EATS | 12-23 | 1988 | Issue 1 | CABLES | Polyethylene protectin tape for buried electricity supply cable | Ian Naylor | ASG | ||||||||
EATS | 12-24 | 1989 | Issue 1 | CABLES | Plastic ducts for buried electric cables | Ian Naylor | ASG | ||||||||
EATS | 12-25 | 1997 | Issue 1 | CABLES | Cable trays | Ian Naylor | ASG | ||||||||
EATS | 13-1 | 1987 | Issue 1 | EQUIPMENT | Portable glass fibre ladders and steps | ||||||||||
EATS | 23-1 | 1978 | Issue 1 | GENERATION | Identification and marking of materials (Tubes, pipes, fabricated assemblies and components including valves) WITHDRAWN | WITHDRAWN | TS 68-1 | ||||||||
EATS | 23-2 | 1983 | Issue 2 | GENERATION | Code of practice for post weld heat treatment (electrical resistance heating elements) | Richard Foreman | |||||||||
EATS | 23-3 | 1989 | Issue 3 | GENERATION | Titanium tubes for heat exchanges and condensers | Richard Foreman | |||||||||
EATS | 23-4 | 1989 | Issue 2 | GENERATION | Seamless steel feed-water heater tubes for high pressure applications | Richard Foreman | |||||||||
EATS | 26-1 | 1977 | Issue 2 | GENERATION | Insulating foam-filled tube and solid rod for live working | ||||||||||
EATS | 26-2 | 1978 | Issue 1 | GENERATION | Insulated tools for live working on high voltage overhead lines | ||||||||||
EATS | 26-3 | 1984 | Issue 2 | GENERATION | Hand held insulated tools for live working up to 1000 volts | ||||||||||
EATS | 26-4 | 1980 | Issue 1 | GENERATION | Overhead line conductor erection clamps - test specification and test certificates | ||||||||||
EATS | 35-1 | 1985 | Issue 4 | TRANSFORMERS | Distribution transformers (from 16kVA to 1000kVA) | Ian Naylor | ASG | ||||||||
EATS | 35-2 | 1982 | Issue 4 | TRANSFORMERS | Emergency rated system transformers - 33/11.5kV delta/star and star/star connected | Ian Naylor | ASG | ||||||||
EATS | 35-5 | 1980 | Issue 1 | TRANSFORMERS | Generator voltage transformers for 500/660MW turbo-generators | Ian Naylor | ASG | ||||||||
EATS | 35-6 | 1980 | Issue 1 | TRANSFORMERS | Generator voltage transformers for gas turbines | Ian Naylor | ASG | ||||||||
EATS | 35-14 | 1984 | Issue 1 | TRANSFORMERS | Formel NF filled transformers WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 35-16 | 1992 | Issue 1 | TRANSFORMERS | Interface arrangement for direct connection of gas-insulated metal-enclosed switchgear to 132kV, 275kV and 400kV transformers | Ian Naylor | ASG | ||||||||
EATS | 35-17 | 1996 | Issue 1 | TRANSFORMERS | Class X current transformers | Ian Naylor | ASG | ||||||||
EATS | 37-1 | 1977 | Issue 2 | LV SWITCHGEAR | 415V ac switchgear, controlgear and fusegear | Ian Naylor | ASG | ||||||||
EATS | 37-2 | 1990 | Issue 3 | LV SWITCHGEAR | LV distribution fuse-boards | Ian Naylor | ASG | ||||||||
EATS | 37-3 | 1981 | Issue 1 | LV SWITCHGEAR | AC metal-enclosed switchgear and controlgear of rated voltages 3.6kV and 12kVPart 1: Circuit-breaker equipment (air-break), Issue 1, 1981Part 2: Fused switching device equipment of 3.6kV rated voltage | Ian Naylor | ASG | ||||||||
EATS | 41-1 | 1969 | Issue 1 | HV SWITCHGEAR | 3.3kV 150MVA airbreak switchgear - floor details and building requirements WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 41-2 | 1976 | Issue 2 | HV SWITCHGEAR | 11kV distribution switchgear (floor details) WITHDRAWN | WITHDRAWN | TS 41-26 | ||||||||
EATS | 41-5 | 1983 | Issue 3 | HV SWITCHGEAR | Requirements for 12KV distribution metal-enclosed indoor switchgear WITHDRAWN | WITHDRAWN | TS 41-26 | ||||||||
EATS | 41-6 | 1974 | Issue 1 | HV SWITCHGEAR | 132kV outdoor busbar type substations with aluminium connections WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 41-7 | 1980 | Issue 1 | HV SWITCHGEAR | 132kV outdoor substations extensible up to four-switch mesh WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 41-8 | 1980 | Issue 1 | HV SWITCHGEAR | 132kV compact transformer feeder substations WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 41-9 | 1974 | Issue 1 | HV SWITCHGEAR | Insulating oil handling and storage equipment for 132kV outdoor substations | Ian Naylor | ASG | ||||||||
EATS | 41-10 | 1995 | Issue 4 | HV SWITCHGEAR | Switchgear for use on 66 and 132kV distribution systems | Ian Naylor | ASG | ||||||||
EATS | 41-11 | 1982 | Issue 2 | HV SWITCHGEAR | Tubular aluminium busbars, connections and terminals fittings for 132kV outdoor substations | Ian Naylor | ASG | ||||||||
EATS | 41-12 | 1975 | Issue 2 | HV SWITCHGEAR | Non-extensible ring main equipments (incorporating an automatic fuse-switch and switches ratings: 250MVA at 11kV and 150MVA at 6.6kV) WITHDRAWN | WITHDRAWN | TS 41-26 | ||||||||
EATS | 41-13 | 1978 | Issue 1 | HV SWITCHGEAR | Air break switch-disconnectors 12kV to 36kV for use on overhead lines WITHDRAWN | WITHDRAWN | TS 41-27 | ||||||||
EATS | 41-15 | HV SWITCHGEAR | Standard circuit diagrams for equipment in 132kV substations | Ian Naylor | ASG | ||||||||||
EATS | 41-15 | 1978 | Issue 1 | HV SWITCHGEAR | Part 1: Transformer feeder, transformer end | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1978 | Issue 1 | HV SWITCHGEAR | Part 2: Transformer feeder, transformer end 132/11/11kV dual secondary | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1982 | Issue 1 | HV SWITCHGEAR | Part 3: Arrangements for locally banking two transformers. Transformer end of a transformer-feeder | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1983 | Issue 1 | HV SWITCHGEAR | Part 4: 132kV busbar substation - feeder circuits | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1988 | Issue 2 | HV SWITCHGEAR | Part 5: Intertripping over voice frequency channels | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1989 | Issue 1 | HV SWITCHGEAR | Part 6: Bus section and bus coupler | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1988 | Issue 1 | HV SWITCHGEAR | Part 7: Arrangements for locally banking a transformer with a feeder at a busbar station | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1986 | Issue 1 | HV SWITCHGEAR | Part 8: 132kV busbar station - busbar protection | Ian Naylor | ASG | ||||||||
EATS | 41-15 | 1986 | Issue 1 | HV SWITCHGEAR | Part 9: AC traction suppies to British Rail | Ian Naylor | ASG | ||||||||
EATS | 41-16 | 1981 | Issue 2 | HV SWITCHGEAR | Apparatus terminations, conductor sizes and associated fittings (copper) used in outdoor and indoor substations with outdoor equipment | Ian Naylor | ASG | ||||||||
EATS | 41-18 | 1995 | Issue 2 | HV SWITCHGEAR | Partial discharge testing of bushings, capacitors, instrument transformers and switchgear of rated voltage 7.2 - 420kV inclusive | Ian Naylor | ASG | ||||||||
EATS | 41-19 | 1979 | Issue 1 | HV SWITCHGEAR | Open type switchgear for use on 33kV systems WITHDRAWN | WITHDRAWN | TS 41-27 | ||||||||
EATS | 41-21 | 1985 | Issue 1 | HV SWITCHGEAR | Portable earthing equipment for open type HV apparatus in substations | Ian Naylor | ASG | ||||||||
EATS | 41-22 | 1982 | Issue 1 | HV SWITCHGEAR | Metal-enclosed switch, switch-disconnecter and earthing switch combinations (ratings 12.5, 16 and 20kA at 7.2kV and 12kV) WITHDRAWN | WITHDRAWN | TS 41-26 | ||||||||
EATS | 41-23 | 1982 | Issue 1 | HV SWITCHGEAR | Metal-enclosed automatic fuse-switch equipment (rating 12.5, 16 and 20kA at 7.2kV and 12kV) WITHDRAWN | WITHDRAWN | TS 41-26 | ||||||||
EATS | 41-24 | 1992 | Issue 1 | EARTHING | Guidelines for the Design, Installation, Testing and Maintenance of Main Earthing Systems in Substations | John Sinclair | OSG | Under Revision | |||||||
EATS | 41-26 | 1991 | Issue 1 | HV SWITCHGEAR | Distribution switchgear for service up to 36kV (cable connected) WITHDRAWN | Ian Naylor | ASG | WITHDRAWN | TS 41-36 | ||||||
EATS | 41-27 | 1991 | Issue 1 | HV SWITCHGEAR | Outdoor distribution switchgear for service up to 36kV (overhead conductor connected), Issue 1, 1991. WITHDRAWN (Superseded by Technical Specification 41-36) | Ian Naylor | ASG | Withdrawn | TS 41-36 | ||||||
EATS | 41-36 | 2000 | Issue 1 | HV SWITCHGEAR | Distribution switchgear for service up to 36kV (cable and overhead conductor connected) | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-1 | 1986 | Issue 2 | OVERHEAD LINES | Survey and preparation of ground line profiles and plotting of tower positions for steel tower overhead transmission lines at 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-2 | 1972 | Issue 1 | OVERHEAD LINES | Design of steel tower overhead transmission lines at 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-3 | 1972 | Issue 1 | OVERHEAD LINES | Design of lattice steel transmission towers for overhead lines at 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-4 | 1986 | Issue 2 | OVERHEAD LINES | Design of foundations for steel towers for overhead transmission lines at 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-5 | 1986 | Issue 2 | OVERHEAD LINES | Fabrication and galvanising of tower and foundation steelwork for overhead transmission lines at 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-6 | 1986 | Issue 2 | OVERHEAD LINES | Construction of overhead transmission lines on steel towers for 132kV and higher voltages | Ian Naylor | ASG | ||||||||
EATS | 43-7 | 1985 | Issue 2 | OVERHEAD LINES | 132kV steel transmission lines: Specification L4(M) – 1978 1 x 175mm2 ACSR per phase - 1 x 70mm2 ACSR earthwire | Ian Naylor | ASG | ||||||||
EATS | 43-8 | 1988 | Issue 2 | OVERHEAD LINES | Overhead line clearances | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-9 | 1986 | Issue 1 | OVERHEAD LINES | 132kV steel tower transmission line specification L7(C) – 1978 2 x 175mm2 ACSR per phase - 1 x 175mm2 ACSR earthwire | Ian Naylor | ASG | ||||||||
EATS | 43-10 | 1974 | Issue 1 | OVERHEAD LINES | 11kV single circuit overhead lines of light construction on wood poles WITHDRAWN | WITHDRAWN | TS 43-40 | ||||||||
EATS | 43-11 | 1984 | Issue 1 | OVERHEAD LINES | 400kV steel tower transmission lines - specification L.12 (2 x 700mm2 AAAC per phase) (1 x 425mm2 AAAC earthwire) | Ian Naylor | ASG | ||||||||
EATS | 43-12 | 1986 | Issue 1 | OVERHEAD LINES | Insulated aerial bundled conductors erection requirements for LV overhead distribution systems, | Ian Naylor | ASG | ||||||||
EATS | 43-13 | 1990 | Issue 2 | OVERHEAD LINES | Aerial bundled conductors (ABC) insulated with cross-linked polyethylene for low voltage overhead distribution | Ian Naylor | ASG | ||||||||
EATS | 43-14 | 1990 | Issue 2 | OVERHEAD LINES | Conductor fittings and associated apparatus for use with LV aerial bundled conductors | Ian Naylor | ASG | ||||||||
EATS | 43-15 | 1990 | Issue 2 | OVERHEAD LINES | Insulator binds and equivalent helical fittings for overhead lines | Ian Naylor | ASG | ||||||||
EATS | 43-20 | 1979 | Issue 1 | OVERHEAD LINES | 11kV and 33kV single circuit overhead lines of heavy construction on wood poles WITHDRAWN | WITHDRAWN | TS 43-40 | ||||||||
EATS | 43-30 | 1981 | Issue 2 | OVERHEAD LINES | Low voltage overhead lines on wood poles | Ian Naylor | ASG | ||||||||
EATS | 43-40 | 1988 | Issue 1 | OVERHEAD LINES | High voltage single circuit overhead lines on wood poles | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-50 | 1984 | Issue 1 | OVERHEAD LINES | 132kV single circuit overhead lines on wood poles | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-81 | 1984 | Issue 1 | OVERHEAD LINES | Portable earthing equipment for high voltage overhead lines up to and including 66kV | Ian Naylor | ASG | ||||||||
EATS | 43-88 | OVERHEAD LINES | Selection and treatment of wood poles and associated timber for overhead lines.Part 1: Technical requirements, Issue 4, 1993Part 2: Essential quality requirements, Issue 1, 1992 | Ian Naylor | ASG | Under Revision | |||||||||
EATS | 43-90 | 1993 | Issue 4 | OVERHEAD LINES | Anti-climbing devices and safety signs for HV lines up to and including 400kV | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-91 | 1984 | Issue 4 | OVERHEAD LINES | Stay strands and stay fittings for overhead lines | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-92 | 1985 | Issue 2 | OVERHEAD LINES | Conductor fittings for overhead lines | Ian Naylor | ASG | Under Revision | |||||||
EATS | 43-93 | 1986 | Issue 3 | OVERHEAD LINES | Line insulators | Ian Naylor | ASG | ||||||||
EATS | 43-94 | 1990 | Issue 3 | OVERHEAD LINES | Earth rods and their connectors | Ian Naylor | ASG | ||||||||
EATS | 43-95 | 1989 | Issue 5 | OVERHEAD LINES | Steelwork for overhead lines | Ian Naylor | ASG | ||||||||
EATS | 43-96 | 1986 | Issue 2 | OVERHEAD LINES | Fasteners and washers for wood pole overhead lines | Ian Naylor | ASG | ||||||||
EATS | 43-97 | 1990 | Issue 1 | OVERHEAD LINES | Steel supports for single circuit 132kV overhead lines | Ian Naylor | ASG | ||||||||
EATS | 43-99 | 1997 | Issue 1 | OVERHEAD LINES | Limits and measurement of radio noise from cap and pin insulators | Ian Naylor | ASG | ||||||||
EATS | 43-100 | 1997 | Issue 1 | OVERHEAD LINES | Conductor tensions and sags | Ian Naylor | ASG | ||||||||
EATS | 43-101 | 1997 | Issue 1 | OVERHEAD LINES | Line and earth conductors | Ian Naylor | ASG | ||||||||
EATS | 43-102 | 1997 | Issue 1 | OVERHEAD LINES | Insulators and fittings for 132kV lines | Ian Naylor | ASG | ||||||||
EATS | 43-103 | 1995 | Issue 1 | OVERHEAD LINES | Low voltage overhead line temporary shrouding materials | ||||||||||
EATS | 43-104 | 1997 | Issue 1 | OVERHEAD LINES | Spacers for twin and quad line conductors | Ian Naylor | ASG | ||||||||
EATS | 43-105 | 1997 | Issue 1 | OVERHEAD LINES | Bi-metal connectors for line conductors | Ian Naylor | ASG | ||||||||
EATS | 43-106 | 1997 | Issue 1 | OVERHEAD LINES | Tubular jumpers and earthing bars for twin line conductors | Ian Naylor | ASG | ||||||||
EATS | 43-107 | 1997 | Issue 1 | OVERHEAD LINES | Selection of earthwire changeover towers for 400kV lines with 4 x 61/.125 in s.c.a. conductors per phase | Ian Naylor | ASG | ||||||||
EATS | 43-108 | 1997 | Issue 1 | OVERHEAD LINES | Suspension clamps for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-109 | 1997 | Issue 1 | OVERHEAD LINES | Bonds for earth conductors | Ian Naylor | ASG | ||||||||
EATS | 43-110 | 1997 | Issue 1 | OVERHEAD LINES | Tension joints (mid span joints) for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-111 | 1997 | Issue 1 | OVERHEAD LINES | Non-tension joints and tee connectors for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-112 | 1997 | Issue 1 | OVERHEAD LINES | Repair sleeves for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-113 | 1997 | Issue 1 | OVERHEAD LINES | Vibration dampers for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-114 | 1997 | Issue 1 | OVERHEAD LINES | Anchor clamps for conductors | Ian Naylor | ASG | ||||||||
EATS | 43-115 | 1997 | Issue 1 | OVERHEAD LINES | Insulators and fittings for 275KV lines | Ian Naylor | ASG | ||||||||
EATS | 43-116 | 1997 | Issue 1 | OVERHEAD LINES | Insulators and fittings for 400kV lines | Ian Naylor | ASG | ||||||||
EATS | 43-117 | 1997 | Issue 1 | OVERHEAD LINES | Installation of aluminium current carrying overhead line conductor fittings | Ian Naylor | ASG | ||||||||
EATS | 43-118 | 1997 | Issue 1 | OVERHEAD LINES | Overhead line erection and maintenance equipment (earthed working) | Ian Naylor | ASG | ||||||||
EATS | 43-119 | 1997 | Issue 1 | OVERHEAD LINES | Design and use of temporary scaffold guards | Ian Naylor | ASG | ||||||||
EATS | 43-120 | 2002 | Issue 1 | OVERHEAD LINES | Fitting for XLPE covered – conductors for overhead lines (having rated voltages Uo/U greater than 0.6/1 kV up to and including 19/33kV | Ian Naylor | ASG | ||||||||
EATS | 43-121 | OVERHEAD LINES | To be published | Ian Naylor | ASG | ||||||||||
EATS | 43-122 | 2002 | Issue 1 | OVERHEAD LINES | XLPE covered – conductors for overhead lines (having rated voltages Uo/U greater than 0.6/1 kV up to and including 19/33kV) | Ian Naylor | ASG | ||||||||
EATS | 43-123 | 1999 | Issue 1 | OVERHEAD LINES | Performance criteria for fall prevention / fall arrest devices for use on poles whilst ascending and descending | ||||||||||
EATS | 43-124 | 1999 | Issue 1 | OVERHEAD LINES | Performance criteria for work positioning devices for prevention of falls on poles | ||||||||||
EATS | 44-1 | 1971 | Issue 2 | GENERATION | Carbon brushes (for rotating electrical machines) | Richard Foreman | GSSG | ||||||||
EATS | 44-2 | 1970 | Issue 1 | GENERATION | Electric motors - dimensions | Richard Foreman | GSSG | ||||||||
EATS | 44-3 | 1980 | Issue 2 | GENERATION | Electric motors - specification (3300V and above) | Richard Foreman | GSSG | ||||||||
EATS | 44-4 | 1980 | Issue 2 | GENERATION | Electric motors - specification (415 volts and below) | Richard Foreman | GSSG | ||||||||
EATS | 44-5 | 1987 | Issue 5 | GENERATION | Testing the insulation systems of stator coils for rotating electrical machines | Richard Foreman | GSSG | ||||||||
EATS | 44-7 | 1978 | Issue 1 | GENERATION | Testing the insulation systems of bars (half coils) for rotating electrical machines of turbine driven and hydro-generator types | Richard Foreman | GSSG | ||||||||
EATS | 48-1 | 1969 | Issue 1 | PROTECTION | Static relays - dimensions WITHDRAWN | WITHDRAWN | None | ||||||||
EATS | 48-2 | 1974 | Issue 1 | PROTECTION | Fault passage indicators for 6.6kV and 11kV underground and overhead distribution systems | Ian Naylor | ASG | ||||||||
EATS | 48-3 | 1977 | Issue 1 | PROTECTION | Instantaneous high-impedance differential protection | Ian Naylor | ASG | ||||||||
EATS | 48-4 | 1983 | Issue 3 | PROTECTION | DC relays associated with a tripping function in protection systems | Ian Naylor | ASG | ||||||||
EATS | 48-5 | 2000 | Issue 2 | PROTECTION | Environmental Test Requirements for Protection Relays and Systems | Ian Naylor | ASG | ||||||||
EATS | 50-1 | 1977 | Issue 2 | CABLES | Direct reading pressure gauges (for oil-filled cable systems) | Ian Naylor | ASG | ||||||||
EATS | 50-2 | 1975 | Issue 1 | METERING | Bimetallic ammeters | Ian Naylor | ASG | ||||||||
EATS | 50-3 | 1975 | Issue 1 | METERING | Code for transmitting and recording metering and associated information | ||||||||||
EATS | 50-4 | 1978 | Issue 1 | METERING | Analogue direct current signal for plant instrumentation and control systems | ||||||||||
EATS | 50-5 | 1983 | Issue 1 | METERING | Standardised contact sensing circuits | ||||||||||
EATS | 50-6 | 1986 | Issue 1 | CABLES | Pressure switches for oil-filled cable systems | Ian Naylor | ASG | ||||||||
EATS | 50-7 | 1986 | Issue 1 | METERING | Token-operated prepayment watt-hour meter - Class 2 | ||||||||||
EATS | 50-8 | 1986 | Issue 1 | METERING | Token acceptor for operation in conjunction with credit watt-hour mete | ||||||||||
EATS | 50-9 | 1997 | Issue 1 | METERING | Equipment for work on cable under induced voltage conditions | ||||||||||
EATS | 50-18 | 1989 | Issue 2 | CONTROL | Design and application of ancillary electrical equipment | Ian Naylor | ASG | Under Revision | |||||||
EATS | 56-1 | 1989 | Issue 2 | GENERATION | Ferritic steel valve casting | Richard Foreman | GSSG | ||||||||
EATS | 62-1 | 1981 | Issue 1 | GENERATION | Boiler feed pump impeller casting | Richard Foreman | GSSG | ||||||||
EATS | 62-2 | 1988 | Issue 2 | GENERATION | Ash pumps | Richard Foreman | GSSG | ||||||||
EATS | 62-3 | 1983 | Issue 1 | GENERATION | Main circulating water pump impeller castings | Richard Foreman | GSSG | ||||||||
EATS | 62-4 | 1983 | Issue 1 | GENERATION | Inspection and testing of boiler feed pump shafts, castings, impellers and diffusers | Richard Foreman | GSSG | ||||||||
EATS | 66-1 | 1989 | Issue 2 | GENERATION | ½ Chromium, molybdenum, vanadium steel casting for steam turbines | Richard Foreman | GSSG | ||||||||
EATS | 66-2 | 1989 | Issue 1 | GENERATION | 2¼ Chromium, molybdenum, steel castings for steam turbines | Richard Foreman | GSSG | ||||||||
EATS | 66-3 | 1989 | Issue 1 | GENERATION | Carbon steel castings for steam turbines | Richard Foreman | GSSG | ||||||||
EATS | 68-1 | 1988 | Issue 2 | GENERATION | Tubes and tube assemblies for boilers | Richard Foreman | GSSG | ||||||||
EATS | 68-2 | 1983 | Issue 1 | GENERATION | Acceptance levels for radiographic examination of flash butt welds in steel tubes | Richard Foreman | GSSG | ||||||||
EATS | 97-1 | 1997 | Issue 1 | CABLES | Special backfill materials for cable installations | Ian Naylor | ASG | ||||||||
EATS | 98-1 | 1997 | Issue 2 | PAINT | Surface preparation and coating systems for new plant and equipment | Ian Naylor | ASG | ||||||||
EATS | 98-2 | 1979 | Issue 1 | GENERATION | Ultrasonic probes: medium frequency, miniature shear wave, angle probes | Richard Foreman | GSSG | ||||||||
EATS | 98-3 | 1981 | Issue 1 | GENERATION | Registration of non-destructive testing personnel | Richard Foreman | GSSG | ||||||||
EATS | 98-4 | 1989 | Issue 1 | GENERATION | Ultrasonic testing of ferrite steel casting | Richard Foreman | GSSG | ||||||||
EATS | 98-5 | GENERATION | Automatic ultrasonic testing of tubes | Richard Foreman | GSSG | ||||||||||
EATS | 98-5 | 1989 | Issue 3 | GENERATION | Part 1: Seamless and welded tubes, outside diameters of 12mm up to but not including 160mm | Richard Foreman | GSSG | ||||||||
EATS | 98-5 | 1989 | Issue 3 | GENERATION | Part 2: Seamless steel tubes, outside diameters 160mm and above | Richard Foreman | GSSG | ||||||||
EATS | 98-5 | 1989 | Issue 2 | GENERATION | Part 3: Longitudinally submerged arc welded steel tubes, outside diameters 160mm and above | Richard Foreman | GSSG | ||||||||
EATS | 98-5 | 1989 | Issue 2 | GENERATION | Part 4: Longitudinally electric resistance and induction welded steel tubes, outside diameter 160mm and above | Richard Foreman | GSSG | ||||||||
EATS | 98-6 | 1981 | Issue 1 | GENERATION | Ultrasonic testing of ferritic steel plate | Richard Foreman | GSSG | ||||||||
EATS | 98-7 | 1982 | Issue 1 | GENERATION | Ultrasonic probes: normal (0E) compression wave probes for contract testing | Richard Foreman | GSSG | ||||||||
EATS | 98-8 | 1982 | Issue 1 | GENERATION | Ultrasonic probes: low frequency single crystal shear wave angle probes | Richard Foreman | GSSG | ||||||||
EATS | 98-9 | 1985 | Issue 1 | GENERATION | Ultrasonic flaw detectors | Richard Foreman | GSSG | ||||||||
EATS | 98-10 | GENERATION | Manual ultrasonic testing of welds in ferritic steel sections | Richard Foreman | GSSG | ||||||||||
EATS | 98-10 | 1984 | Issue 2 | GENERATION | Part 1: Butt welds in ferritic steel sections greater than 10mm thick | Richard Foreman | GSSG | ||||||||
EATS | 98-10 | 1983 | Issue 1 | GENERATION | Part 2: Nozzle, branch, stub and attachment welds | Richard Foreman | GSSG | ||||||||
EATS | 98-10 | 1984 | Issue 2 | GENERATION | Part 3: Butt welds in tubes of outside diameters between 25mm and 120mm inclusive | Richard Foreman | GSSG | ||||||||
EATS | 98-10 | 1988 | Issue 1 | GENERATION | Part 4: Guidance on inspection capability and joint design | Richard Foreman | GSSG | ||||||||
EATS | 98-11 | 1989 | Issue 2 | GENERATION | Radiographic testing of steel castings | Richard Foreman | GSSG | ||||||||
EATS | 98-12 | 1989 | Issue 1 | GENERATION | Calibration and routine performance checks of ultrasonic NDT equipment | Richard Foreman | GSSG | ||||||||
EATS | 98-14 | 1989 | Issue 2 | GENERATION | Ultrasonic testing procedures for 18 chromium, 18 manganese generator coil retaining ring forgings | Richard Foreman | GSSG | ||||||||
EATS | 98-15 | GENERATION | Automatic eddy-current testing of tubes. | Richard Foreman | GSSG | ||||||||||
EATS | 98-15 | 1989 | Issue 2 | GENERATION | Part 1: Detection imperfections in welded titanium tubes | Richard Foreman | GSSG | ||||||||
EATS | 98-15 | 1989 | Issue 2 | GENERATION | Part 2: Verification of hydraulic leak tightness of steel tubes | Richard Foreman | GSSG | ||||||||
EATS | 98-15 | 1989 | Issue 2 | GENERATION | Part 3: Detection of imperfection in steel tubes | Richard Foreman | GSSG | ||||||||
EATS | 98-16 | 1990 | Issue 1 | GENERATION | Defect evaluation and size estimation by the manual ultrasonic testing method | Richard Foreman | GSSG | ||||||||
EATS | 98-17 | 1988 | Issue 1 | GENERATION | Radiographic examination of fusion welded butt joints in steel | Richard Foreman | GSSG | ||||||||
EATS | 98-19 | 1990 | Issue 1 | GENERATION | Acceptance criteria for pipe circumferential butt welds in ferritic alloy steels | Richard Foreman | GSSG | ||||||||
EATS | 98-20 | 1989 | Issue 1 | GENERATION | Penetrant flaw detection capability | Richard Foreman | GSSG | ||||||||
EATS | 98-21 | 1989 | Issue 1 | GENERATION | Magnetic particle and dye penetrant testing materials - chemical compatibility and health hazards | Richard Foreman | GSSG | ||||||||
EATS | 98-22 | 1989 | Issue 1 | GENERATION | Capability of ultrasonic testing of ferritic steel forgings | Richard Foreman | GSSG | ||||||||
EATS | 98-23 | 1990 | Issue 1 | GENERATION | Ultrasonic and visual inspection of components lined with tin based white metal | Richard Foreman | GSSG | ||||||||
EATS | 99-1 | 1985 | Issue 5 | GENERATION | Statistical review periods and the numbering of weeks | ||||||||||
EATS | 99-2 | 1988 | Issue 4 | GENERATION | Calendars and Diaries | ||||||||||
EATS | 99-3 | 1981 | Issue 1 | OPERATIONS | Definitions of terms used when predicting or measuring electricity transmission and distribution reliability | John Sinclair | OSG | ||||||||
BEBS | JOINTING INSTRUCTIONS CJ 1101M | 1976 | CABLES | Jointing instructions for Vertical, horizontal or inverted indoor sealing end for 6350/11 000V single core cables up to and including 1000mm2 (does not provide for the jointing of milliken conductored cable) | Ian Naylor | ASG | |||||||||
BEBS | CJ 1102M | 1976 | CABLES | Jointing instructions for Vertical outdoor sealing end for 6350/11 000V single core cables up to and including 1000mm2 (does not provide for the jointing of milliken conductored cable) | Ian Naylor | ASG | |||||||||
BEBS | CJ 1103M | 1970 | CABLES | Jointing instructions for crepe paper insulated straight through joints for belted 3 core 11kV pre-impregnated or mass-impregnated non-draining solid type cables with stranded aluminium conductors | Ian Naylor | ASG | |||||||||
BEBS | OVERHEAD LINES L6 | 1966 | OVERHEAD LINES | Specification for 400kV steel tower transmission lines with 4 x 0.4 sq.in. cu equiv. SCA conductor per phase | Ian Naylor | ASG | |||||||||
BEBS | MEASUREMENT, METERING AND PROTECTION M3 | 1973 | METERING | Specification for Restricted hour and time of day tariff time switches | |||||||||||
BEBS | SUBSTATIONS AND SWITCHGEAR S1 | 1965 | HV SWITCHGEAR | General technical specification for standard 33kV indoor metalclad switchgear, 750MVA and 1000MVA ratings. WITHDRAWN (Superseded by Technical Specification 41-26) | Withdrawn | TS 41-26 | |||||||||
BEBS | S10 | 1963 | HV SWITCHGEAR | Specification for Standard steelwork, etc for 11kV pole-mounted air-break insulators. WITHDRAWN (Not superseded or replaced) | Withdrawn | None | |||||||||
BEBS | S12 | 1964 | CONTROL | Specification for Standard numbering for small wiring for switchgear and transformers together with their associated replay and control panels | Ian Naylor | ASG | |||||||||
BEBS | S17 | 1968 | HV SWITCHGEAR | Specification for Partial discharge testing of demountable synthetic resin bonded and oil impregnatged paper bushings of rated voltage 22kV and above | Ian Naylor | ASG | |||||||||
BEBS | TRANSFORMERS T2 | 1958 | TRANSFORMERS | Large transformers (transformers of all above 33kV and lower voltage transformers above 20MVA). WITHDRAWN (Superseded by T2, 1966 - Sections 1-34) | Withdrawn | ||||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Specification for Transformers and reactors (34 sections with index and schedules). | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | + Interim index and general requirements | |||||||||||
BEBS | T2 | 1966 | TRANSFORMERS | + Schedules of general particulars and guarantees | |||||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 1: Generator station and unit transformers: general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 2: Transmission transformers (excluding auto-transformers): general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 3: Auto-transformers: general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 4: Oil-immersed auxiliary transformers for power stations: general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 5: Air insulated auxiliary transformers for power stations: general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 6: Earthing and auxiliary transformers for transmission stations: general design and performance | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 7: Oil-immersed series and shunt reactors | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 8: Magnetic circuits | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 9: Windings, connections and terminal markings | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 10: Minimum safety and external air clearances and co-ordinating gaps | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 11: Bushings and terminals | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 12: Cable boxes, cable sealing-end chambers and disconnecting chambers | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 13: Noise and vibration | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 14: Earthing systems and connections | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 15: Tanks, conservator vessels and pressure relief devices | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 16: Values, drain and air release plugs and oil sampling devices | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 17: Cleaning and paint or other protective systems | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 18: Dehydrating breathers | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 19: Oil level gauges | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 20: Radiators, cooling-banks and oil/water coolers | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 21: Rating and diagram plates, valve location and function plates, terminal identification plates and labels | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 22: Oil circulation pumps | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 23: Fans | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 24: Motors | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 25: Electrical control of cooling equipment | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 26: Tap changing equipment | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 27: Electrical control of on-load tap change equipment | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 27: Electrical control of on-load tap change equipment | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 28: Temperature indicators for oil immersed transformers and reactors | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 29: Gas and oil-actuated relays | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 30: Oil flow indicators, oil pressure gauges and differential pressure gauges | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 31: Marshalling kiosks and cubicles | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 32: Terminal housings for secondary wiring | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 33: Control connections, instrument wiring, interconnecting cables, terminal blocks and fuses | Ian Naylor | ASG | |||||||||
BEBS | T2 | 1966 | TRANSFORMERS | Section 34: Drying out, transport and erection | Ian Naylor | ASG | |||||||||
BEBS | T3 | 1962 | TRANSFORMERS | Specification for Transformers for 33kV and 22kV systems (up to 20MVA) | Ian Naylor | ASG | |||||||||
BEBS | T3 | 1962 | TRANSFORMERS | + Guide on impulse voltage testing power transformers and reactors | |||||||||||
BEBS | T3 | 1962 | TRANSFORMERS | + Note: These documents have no reference numbers. | |||||||||||
EAER | C1/7 | 1981 | CABLES | Type approval test for 33kV mass
impregnated paper insulated solid type cable systems including non-draining
types |
Ian Naylor | ASG | |||||||||
EAER | C5 | 1951 | CABLES | House service overhead system (HSOS) cables | Ian Naylor | ASG | |||||||||
EAER | C7/1 | 1952 | CABLES | Use of earthed and unearthed type cables on 33kV and lower voltage systems | Ian Naylor | ASG | |||||||||
EAER | C16 | 1954 | CABLES | Colours of PVC conductor | Ian Naylor | ASG | |||||||||
EAER | C25/2 | 1973 | CABLES | Code of practice on the design of straight through, branch and service joints for use on paper-insulated lead sheathed cables operating at voltages up to 600/1000 volts | Ian Naylor | ASG | |||||||||
EAER | C28/4 | 1975 | CABLES | Type approval tests for impregnated paper insulated gas pressure and oil filled power cable systems from 33kV to 132kV inclusive | Ian Naylor | ASG | |||||||||
EAER | C34/1 | 1976 | CABLES | Code of practice on the design of straight through and branch joints for use on paper-insulated lead-sheathed cables operating at voltages from 3300V up to 11 000V | Ian Naylor | ASG | |||||||||
EAER | C39/5 | 1975 | CABLES | Identification of buried plastic sheathed cables | Ian Naylor | ASG | |||||||||
EAER | C43/1 | 1966 | CABLES | Dimensions of copper terminal stems for sealing ends of outdoor or indoor type but not oil-immersed sealing ends | Ian Naylor | ASG | |||||||||
EAER | C46/1 | 1981 | CABLES | Measures necessary to prevent corrosion damage to buried metallic structures by neighbouring cathodic protection installations | Ian Naylor | ASG | |||||||||
EAER | C47/1 (1975) | 1975 | CABLES | Type approval tests for single-core impregnated paper-insulated gas pressure and oil-filled power cable systems for 275 and 400kV | Ian Naylor | ASG | |||||||||
EAER | C48/1 | 1974 | CABLES | Type approval tests for anti-corrosion coverings for pressure type cables including pipe line cables | Ian Naylor | ASG | |||||||||
EAER | C53 | 1965 | CABLES | Vertical outdoor sealing ends for 22kV up to 1.5 sq.in. screened or unscreened mass impregnated or non-draining solid type cables | Ian Naylor | ASG | |||||||||
EAER | C55/4 | 1989 | CABLES | Insulated sheath power cable systems | Ian Naylor | ASG | |||||||||
EAER | C61 | 1967 | CABLES | Installation bending radii of 33kV and higher voltage cables | Ian Naylor | ASG | |||||||||
EAER | C62/3 | 1971 | CABLES | Current ratings of copper and aluminium conductored PVC insulated and PVC sheathed HSOS cables | Ian Naylor | ASG | |||||||||
EAER | C64 | 1969 | CABLES | Testing procedure for approval of joints for cables generally to BEBS C5# | Ian Naylor | ASG | |||||||||
EAER | CABLES | # BEBS C5 has been superseded by Technical Specification 09-6 and Engineering Recommendation C64 will be revised in due course. | |||||||||||||
EAER | C66/1 | 1979 | CABLES | Type approval testing procedure: protective boxes for use with buried accessories employed on 33kV - 400kV insulated sheath power cable (and for sheath sectionalising insulation embodied in such accessories) | Ian Naylor | ASG | |||||||||
EAER | C67 | 1970 | CABLES | Specification for impregnated paper-insulated solid type cables for voltages up to and including 33 000 volts and PVC insulated cables for voltages up to and including 3300 volts | Ian Naylor | ASG | |||||||||
EAER | C68 | 1970 | CABLES | Method of terminating the carbon paper screen on 11kV belted multicore cables | Ian Naylor | ASG | |||||||||
EAER | C79 | 1972 | CABLES | Type approval tests for connectors and terminations for aluminium conductors of insulated power cables | Ian Naylor | ASG | |||||||||
EAER | C81/4 | 1999 | CABLES | Type Approval Tests for Accessories for 600/1000 Volt Cable Systems | Ian Naylor | ASG | |||||||||
EAER | C82 | 1977 | CABLES | Pulling-in 11kV aluminium sheathed, consac and waveform cables | Ian Naylor | ASG | |||||||||
EAER | C84/2 | 2000 | CABLES | Code of practise for the maintenance of self-contained fluid-filled pressure assisted cable systems up to 400kV operating voltage | Ian Naylor | ASG | |||||||||
EAER | C85 | 1977 | CABLES | Joints for auxiliary multicore and multipair cables generally to ESI Standard 09-6: record of type tests | Ian Naylor | ASG | |||||||||
EAER | C86 | 1977 | CABLES | Approved cables to ESI Standard 09-8 (impregnated paper-insulated 600/1000V able with three solid aluminium phase conductors and aluminium sheath/neutral conductor (consac)) | Ian Naylor | ASG | |||||||||
EAER | C87/1 | 1978 | CABLES | Approved cables to ESI Standard 09-9 (polymeric insulated, combined neutral/earth (CNE) cables with solid aluminium phase conductors and concentric aluminium wire waveform neutral/earth conductor) | Ian Naylor | ASG | |||||||||
EAER | C89 | 1986 | CABLES | Performance specification for terminations on polymeric insulated cables rated at 12kV and 36kV maximum system voltage | Ian Naylor | ASG | |||||||||
EAER | C90/1 | 1999 | CABLES | Type Approval Tests for Accessories for Power Cables with Rated Voltage from 16/6kV up to and Including 19/33kV. 1999 | Ian Naylor | ASG | |||||||||
EAER | C92 | 1987 | CABLES | Performance specifications for pole top terminations on 6350/11 000V paper insulated cables | Ian Naylor | ASG | |||||||||
EAER | C93 | 1989 | CABLES | Type approval tests for mechanical connections to metallic sheaths of cables | Ian Naylor | ASG | |||||||||
EAER | C94 | 1991 | CABLES | Guide for physical inspection of newly manufactured 33kV mind cable | Ian Naylor | ASG | |||||||||
EAER | C97 | 1997 | CABLES | Code of Practice on the marking of high-voltage cable routes | Ian Naylor | ASG | |||||||||
EAER | GENERAL | GENERAL | |||||||||||||
EAER | G5/4 | 2001 | GENERAL | Planning levels for harmonic voltage distortion & the connection of non-linear equipment to transmission systems & distribution networks in the United Kingdom | John Sinclair | OSG | |||||||||
EAER | G9/6 | 1978 | GENERAL | Voltage testing devices | |||||||||||
EAER | G12/3 | 1995 | EARTHING | Requirements for the application of protective multiple earthing to low voltage networks | John Sinclair | OSG | |||||||||
EAER | G14 | 1971 | EARTHING | Protective multiple earthing: recommended principles of testing to ensure correct polarity | John Sinclair | OSG | |||||||||
EAER | G16 | 1972 | GENERAL | Standard specification for a new single-phase service termination/metering up to 100A. WITHDRAWN (Not superseded or replaced) | |||||||||||
EAER | G17/3 | 1988 | GENERAL | Leakage of flammable gases: recommendations | John Sinclair | OSG | |||||||||
EAER | G19/1 | 1977 | GENERAL | Model guidelines for operations or work on the premises of consumers receiving HV supply | |||||||||||
EAER | G21 | 1975 | GENERAL | Assessment of oil handling and storage plant requirements for 132kV outdoor substations | John Sinclair | OSG | |||||||||
EAER | G22/2 | 1984 | GENERAL | Superimposed signals on public electricity supply network | John Sinclair | OSG | |||||||||
EAER | G23 | 1974 | GENERAL | Reinstatement under the Public Utilities Street Works Act 1950: Model Agreement and Specifications | John Sinclair | OSG | |||||||||
EAER | G27 | 1975 | GENERAL | Mobile radio systems - modulation in the VHF middle band | |||||||||||
EAER | G28/3 | 1989 | GENERAL | National Equipment Defect Report Scheme - notes of guidance | Ian Naylor | ASG | |||||||||
EAER | G29 | 1977 | GENERAL | Farm hygiene: precautions to prevent spread of animal and poultry diseases | |||||||||||
EAER | G30/1 | 1986 | GENERAL | Guidance on pole top rescue procedures | |||||||||||
EAER | G31 | 1976 | GENERAL | Recommended colour code for control boards, diagrams and wall maps | John Sinclair | OSG | |||||||||
EAER | G32/1 | 1985 | GENERAL | Guide to safety in the storage, handling and use of highly flammable liquids and liquefied petroleum gases | |||||||||||
EAER | G33 | 1977 | GENERAL | 132kV plant records | |||||||||||
EAER | G38/1 | 1985 | GENERAL | Operational procedure associated with electricity supplies for traction purposes on ac and dc electrified lines | |||||||||||
EAER | G39/1 | 1992 | GENERAL | Model code of practice covering electrical safety in the planning, installation, commissioning and maintenance of public lighting and other street furniture | John Sinclair | OSG | |||||||||
EAER | G49 | 1981 | GENERAL | Jointing instructions for 132kV and 275kV compression cables, fittings and ancillary equipment (Pirelli Enfield) CEGB Manual T4 Part 2, J1-J3 | Ian Naylor | ASG | |||||||||
EAER | G52 | 1981 | GENERAL | Guide to the drafting and presentation of ESI Standards | |||||||||||
EAER | G55/1 | 2000 | GENERAL | Safe Tree Working in Proximity to Overhead Electric Lines | |||||||||||
EAER | G58/2 | 1995 | GENERAL | Purchase, use, storage, inspection and maintenance of hand held insulated tools for live working up to 1000V | |||||||||||
EAER | G59/1 | 1991 | GENERAL | Recommendations for the connection of embedded generating plant to the Public Electricity Suppliers’ distribution systems | John Sinclair | OSG | |||||||||
EAER | G61 | 1985 | GENERAL | Handling of electrostatic sensitive devices | |||||||||||
EAER | G64 | 1986 | GENERAL | Safety in cableways | |||||||||||
EAER | G66 | 1986 | GENERAL | Guidance on the specification, use and maintenance of portable lifting equipment in Area Boards | |||||||||||
EAER | G67 | 1987 | GENERAL | Guidance on safety in conductor stringing on overhead lines | |||||||||||
EAER | G69 | 1988 | GENERAL | Guidance on the safety aspects of work on sulphur hexafluoride filled distribution equipment up to 145kV | |||||||||||
EAER | G74 | 1992 | GENERAL | Procedure to meet the requirements of IEC 909 for the calculation of short-circuit currents in three-phase AC power systems | John Sinclair | OSG | |||||||||
EAER | G75/1 | 2002 | GENERAL | Recommendations for the connection of embedded generating plant to Public distribution systems above 20kV or with outputs over 5MW | John Sinclair | OSG | |||||||||
EAER | G75 | 1996 | GENERAL | (WITHDRAWN)Recommendations for the connection of embedded generating plant to Public Electricity Supplies’ distribution systems above 20kV or with outputs over 5MW | WITHDRAWN | ||||||||||
EAER | G76 | 1996 | GENERAL | Guide to the Audit and Certification of Suppliers’Quality Management Systems | Ian Naylor | ASG | |||||||||
EAER | G76 | 1996 | GENERAL | Part 1: Guide to the Organisation and Operation of Accredited Third Party Certification Bodies | Ian Naylor | ASG | |||||||||
EAER | G76 | 1996 | GENERAL | Part 2(a): Guide to the Audit of the Quality Management Systems of suppliers of High Voltage Switchgear | Ian Naylor | ASG | |||||||||
EAER | G76 | 1996 | GENERAL | Part 2(b): Guide of the Audit of the Quality Management Systems of suppliers of Low Voltage and High Voltage Cable and Accessories | Ian Naylor | ASG | |||||||||
EAER | G76 | 1996 | GENERAL | Part 2 (c): Guide to the Audit of the Quality Managment Systems of suppliers High Voltage Transformers and Reactors | Ian Naylor | ASG | |||||||||
EAER | G77/1 | 2003 | GENERAL | Recommendation for the Connection of Inverter-Connected Single-Phase Photovoltaic (PV) Generators up to 5KVA to Public Distribution Networks. | John Sinclair | OSG | WITHDRAWN | G83/1 | |||||||
EAER | G77 | 2000 | GENERAL | (WITHDRAWN) Recommendation for the Connection of Inverter-Connected Single-Phase Photovoltaic (PV) Generators up to 5KVA to Public Distribution Networks | WITHDRAWN | ||||||||||
EAER | G78 | 2003 | GENERAL | Recommendations for low voltage connections to mobile phone base stations with antennae on high voltage structures | John Sinclair | OSG | |||||||||
EAER | G80 | 2003 | GENERAL | Recommendations for the safe working of utilities’ staff and other parties near Light Rapid Transit Systems | John Sinclair | OSG | |||||||||
EAER | G83 | 2003 | GENERAL | Recommendations for the Connection of small scale Embedded Generators (up to 16 A per phase) in parallel with public low-voltage Distribution Networks | John Sinclair | OSG | |||||||||
EAER | L7/2 | 1978 | GENERAL | The national scheme for inspection of wood poles at suppliers’ yards: Code of practice for resident pole inspectors. WITHDRAWN | WITHDRAWN | TS 43-88 | |||||||||
EAER | L9/3 | 1995 | GENERAL | Structural testing of wood poles prior to climbing or use as a personal support | |||||||||||
EAER | L11/4 | 1967 | GENERAL | Clearances between the lines of the Central Electricity Generating Board and other overhead power lines WITHDRAWN | WITHDRAWN | TS 43-8 | |||||||||
EAER | L13/2 | 2003 | GENERAL | Street lighting brackets recommendations for attachment to jointly used poles | Ian Naylor | ASG | |||||||||
EAER | L15/5 | 2003 | GENERAL | Overhead lines; 1-11kV; BT line crossings; additional requirements for suppression of electrical interference | Ian Naylor | ASG | |||||||||
EAER | L22/1 | 1971 | GENERAL | Attachment of Post Office letterboxes and signs to poles supporting LV or MV head lines | John Sinclair | OSG | |||||||||
EAER | L31 | 1967 | GENERAL | Railway Wayleave Agreement: second
schedule - general and engineering conditions Notices - safe working clearance for crane jibs |
|||||||||||
EAER | L32/1 | 1975 | GENERAL | Recommended procedure for erecting Area Board overhead lines over motorways | Ian Naylor | ASG | |||||||||
EAER | L35 | 1971 | GENERAL | General requirements for survey and
construction contracts for steel tower overhead transmission lines at 132kV
and higher voltages with model forms of enquiry |
Ian Naylor | ASG | |||||||||
EAER | L36 | 1971 | GENERAL | Metric profile scales | Ian Naylor | ASG | |||||||||
EAER | L37 | 1971 | GENERAL | Overhead transmission steel tower line constructions: Code of behaviour | Ian Naylor | ASG | |||||||||
EAER | L38/1 | 1991 | GENERAL | Recommendations for the Protective
greasing of PVC-covered copper and
bare and PVC-covered aluminium based overhead line conductors |
Ian Naylor | ASG | |||||||||
EAER | L41 | 1987 | GENERAL | Use of home grown wood poles for overhead line supports | Ian Naylor | ASG | |||||||||
EAER | L43 ( | 1984 | GENERAL | Design and use of skycradles at line crossings of motorways, other major roads and railways | Ian Naylor | ASG | |||||||||
EAER | M1/2 ( | 1956 | METERING | Standardisation of equipment required for kW maximum demand metering on consumer’s premises. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | M3 | 1951 | METERING | Meter voltage markings. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | M7/1 | 1956 | METERING | Certification of meters other than kWh meters. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | M8 | 1956 | METERING | Two-rate meters - names of rates. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | M10/4 | 1991 | METERING | Serial numbering of meters | |||||||||||
EAER | M12/1 | 1957 | METERING | Standard wiring polyphase metering equipments. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | M15/4 | 1981 | METERING | Fused flexible leads for use with portable voltage measuring instruments at voltages up to 600 volts ac/dc | |||||||||||
EAER | M26/2 | 1988 | METERING | Standard purchasing requirements for single phase, one-rate and two-rate house service credit meters | |||||||||||
EAER | M27 | 1985 | METERING | Switching arrangements for multi-rate
meters. WITHDRAWN |
WITHDRAWN | BS 5685:Part 5:1987 | |||||||||
EAER | P2/5 | 1978 | PLANNING | Security of supply | John Sinclair | OSG | |||||||||
EAER | P5/5 | 1987 | PLANNING | Design of low voltage underground networks for new housing estates | John Sinclair | OSG | |||||||||
EAER | P7/2 | 1970 | PLANNING | Supply to arc furnaces. WITHDRAWN | WITHDRAWN | ER P28 | |||||||||
EAER | P8 | 1965 | PLANNING | Supply to colliery winders and rolling mills. WITHDRAWN | WITHDRAWN | ER P28 | |||||||||
EAER | P9 | 1963 | PLANNING | Supply to welding plant. WITHDRAWN | WITHDRAWN | ER P28 | |||||||||
EAER | P11/1 | 1969 | PLANNING | Compact 132/33kV substations | Ian Naylor | ASG | |||||||||
EAER | P13/1 | 1979 | PLANNING | Electric motors - starting conditions. WITHDRAWN | WITHDRAWN | ER P28 | |||||||||
EAER | P14 | 1971 | PLANNING | Preferred switchgear ratings | Ian Naylor | ASG | |||||||||
EAER | P15 | 1971 | PLANNING | Transformers loading guide - a guide to the loading of double-wound transformers having nominal ratings of 120MVA and below. Supplying systems at 66kV and below the supergrid and 132kV system, (See ACE 31, 1973) | Ian Naylor | ASG | |||||||||
EAER | P16 | 1975 | PLANNING | EHV or HV supplies to induction furnaces | John Sinclair | OSG | |||||||||
EAER | P17 | 1976 | PLANNING | Current rating guide for distribution cables, Part 1: Cables for 11kV, Part 2: Solid type cables for 33kV | Ian Naylor | ASG | |||||||||
EAER | P18 | 1978 | PLANNING | Complexity of 132kV circuits | |||||||||||
EAER | P20/1 | 1989 | EARTHING | Earthing policy in relation to the customers' installations | John Sinclair | OSG | |||||||||
EAER | P21/5 | 1988 | PLANNING | Comparative capital costs between overhead lines and underground cables | Ian Naylor | ASG | |||||||||
EAER | P22 | 1981 | EARTHING | Code of practice procedure for advising customers on the unsuitability of water pipe for use as earth electrodes | John Sinclair | OSG | |||||||||
EAER | P23/1 | 1991 | EARTHING | Consumers’ earth fault protection for compliance with the IEE Wiring Regulations for Electrical Installations | John Sinclair | OSG | |||||||||
EAER | P24 | 1984 | PLANNING | AC traction supplies to British Rail | John Sinclair | OSG | |||||||||
EAER | P25/1 | 1996 | PLANNING | The short-circuit characteristics of
Public Electricity Suppliers’ low voltage distribution networks and the
co-ordination of overcurrent
protective devices on 230V single phase supplies up to 100A |
John Sinclair | OSG | |||||||||
EAER | P26 | 1985 | PLANNING | The estimation of the maximum prospective short-circuit current for three phase 415V supplies | John Sinclair | OSG | |||||||||
EAER | P27 | 1986 | PLANNING | Current rating guide for high voltage overhead lines operating in the UK distribution system | Ian Naylor | ASG | |||||||||
EAER | P28 | 1989 | PLANNING | Planning limits for voltage fluctuations caused by industrial, commercial and domestic equipment in the United Kingdom | |||||||||||
EAER | P29 | 1990 | PLANNING | Planning limits for voltage unbalance in the UK for 132kV and below | John Sinclair | OSG | |||||||||
EAER | PO1 | 1975 | POST OFFICE | Post Office Memorandum A80(e): Protection of Post Office lines from contact with low or medium voltage power lines | Ian Naylor | ASG | |||||||||
EAER | PO2 | 1975 | POST OFFICE | Post Office Memorandum A231(b): Protection of Post Office lines for high voltage power lines | Ian Naylor | ASG | |||||||||
EAER | PO3 | 1976 | POST OFFICE | Technical conditions applicable under Master Wayleave agreements between the Post Office and the Electricity Supply Industry for wayleaves on Post Office telecommunications property | Ian Naylor | ASG | |||||||||
EAER | PO4/1 | 1988 | POST OFFICE | Services to British Telecom Public Telephone Housings | John Sinclair | OSG | |||||||||
EAER | S2/4 | 1976 | SUBSTATION | Limitation of fire risk in substations at 132kV and below and in enclosed cableways | Ian Naylor | ASG | |||||||||
EAER | S3/1 | 1978 | SUBSTATION | Metering current transformers for use in switchgear | Ian Naylor | ASG | |||||||||
EAER | S5/1 | 1966 | EARTHING | Earthing installations in substations | John Sinclair | OSG | |||||||||
EAER | S15 | SUBSTATION | Standard schematic diagrams | Ian Naylor | ASG | ||||||||||
EAER | S15 | 1956 | SUBSTATION | Part 1: (1956) Schematic diagrams | Ian Naylor | ASG | |||||||||
EAER | S15 | 1963 | SUBSTATION | Part 2: (1963) Alarm schemes | Ian Naylor | ASG | |||||||||
EAER | S15 | 1967 | SUBSTATION | Part 3: (1967) Basic diagrams for voltage and current transformer secondary circuits | Ian Naylor | ASG | |||||||||
EAER | S15 | 1970 | SUBSTATION | Part 4: (1970) Circuit diagrams for 6.6/11kV standard distribution switchgear | Ian Naylor | ASG | |||||||||
EAER | S17 | 1959 | SUBSTATION | Guide for light current control, indication and alarm equipment | Ian Naylor | ASG | |||||||||
EAER | S26 | 1968 | SUBSTATION | Aluminium busbar installations for use in 33kV outdoor substations. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER | S30 | 1973 | SUBSTATION | Uprating 132kV 3500MVA substations to 5000MVA | Ian Naylor | ASG | |||||||||
EAER | S31 | 1973 | SUBSTATION | Increase in single-phase earth fault rating at 132kV 3500MVA substations | Ian Naylor | ASG | |||||||||
EAER | S34 | 1986 | EARTHING | A guide for assessing the rise of earth potential at substation sites | John Sinclair | OSG | |||||||||
EAER | S37 | 2000 | SUBSTATION | Code of practise for the safe working on pilot, auxiliary and communications cables | |||||||||||
EAER | TELE.2 | 1997 | TELECOMMUNICATION | Installation of optical cabling in hazardous areas: Overhead power lines | Ian Naylor | ASG | |||||||||
EAER | T1 | 1949 | TRANSFORMERS | System phasing | Ian Naylor | ASG | |||||||||
EAER | T3 | 1950 | TRANSFORMERS | Automatic voltage control at grid supply points (Proposed standard requirement for substations with two transformers) | Ian Naylor | ASG | |||||||||
ACE | ACE 1 | 1953 | OPERATIONS | Report on Power factor improvement | John Sinclair | OSG | |||||||||
ACE | ACE 3 | 1956 | CAPACITORS | Report on Use of series capacitors in power systems | John Sinclair | OSG | |||||||||
ACE | ACE 4 | 1961 | OPERATIONS | Supply to colliery winders and rolling mills | John Sinclair | OSG | |||||||||
ACE | ACE 7 | 1963 | OPERATIONS | Supply to welding plant | John Sinclair | OSG | |||||||||
ACE | ACE 9 | 1964 | METERING | Meter record systems. WITHDRAWN | WITHDRAWN | None | |||||||||
ACE | ACE 11 | 1966 | HV SWITCHGEAR | Report on Standardisation of auto-reclosing facilities on 11kV ground-mounted metalclad distribution switchgear | Ian Naylor | ASG | |||||||||
ACE | ACE 12 | 1966 | SUBSTATION | Lightning fault investigation - ten year survey | Ian Naylor | ASG | |||||||||
ACE | ACE 13 | 1966 | Design of medium voltage underground networks for new housing estates. WITHDRAWN | WITHDRAWN | ER P5/5 | ||||||||||
ACE | ACE 14 | 1974 | SAFETY | Guide and report on high voltage live line working on overhead lines carried on steel, wood or concrete supports up to and including 132kV | |||||||||||
ACE | ACE 15 | 1970 | OPERATIONS | Harmonic distortion caused by convertor equipment | John Sinclair | OSG | |||||||||
ACE | ACE 17 | 1967 | CABLES | Method of testing connectors and terminations for aluminium conductors of insulated power cables (Out of print) (Note: This has been superseded for reference purposes by Engineering Recommendation C.79) | |||||||||||
ACE | ACE 19 | 1967 | CABLES | Induced voltages in auxiliary cables | John Sinclair | OSG | |||||||||
ACE | ACE 20 | 1969 | OPERATIONS | A simplified assessment of induction motor stability under system fault conditions | John Sinclair | OSG | |||||||||
ACE | ACE 21 | 1969 | OPERATIONS | Guide and report on medium and low voltage live line working | John Sinclair | OSG | |||||||||
ACE | ACE 22 | 1969 | OPERATIONS | Survey of the amplitudes and frequency of occurrence of surges on MV systems | John Sinclair | OSG | |||||||||
ACE | ACE 23 | 1969 | OPERATIONS | Guide to the provision of electronic telecontrol equipments for Area Electricity Boards | John Sinclair | OSG | |||||||||
ACE | ACE 24 | 1969 | OPERATIONS | Report on Standardisation of coding for ripple control signals | John Sinclair | OSG | |||||||||
ACE | ACE 25 | 1970 | OPERATIONS | Analysis of demand and transformer capacity at HV/MV ground-mounted substations | John Sinclair | OSG | |||||||||
ACE | ACE 26 | 1970 | OPERATIONS | Supply to arc furnaces | John Sinclair | OSG | |||||||||
ACE | ACE 27 | 1971 | OPERATIONS | WITHDRAWN (Superseded by Technical Specification 06-1, Engineering Recommendation G30 and ACE Report 60) | WITHDRAWN | ||||||||||
ACE | ACE 28 | 1972 | OPERATIONS | Guide on consumers’ practice for under-voltage relays | John Sinclair | OSG | |||||||||
ACE | ACE 30 | 1972 | OVERHEAD LINES | Report on Recommended procedures for the selection of power line carrier frequencies | Ian Naylor | ASG | |||||||||
ACE | ACE 31 | 1973 | TRANSFORMERS | Assessment of the need for transformer reinforcement by means of thermal calculations of transformer cyclic ratings | Ian Naylor | ASG | |||||||||
ACE | ACE 32 | 1974 | OPERATIONS | Engineering Resource Management in Area Board Districts | John Sinclair | OSG | |||||||||
ACE | ACE 33 | 1973 | OVERHEAD LINES | Continental type climbing shoes | |||||||||||
ACE | ACE 34 | 1974 | SUBSTATION | The establishment of plant and circuit data files | Ian Naylor | ASG | |||||||||
ACE | ACE 37 | 1974 | SAFETY | Live work, French practice and activities of the British Live Working Liaison Group. Part 1 & Part 2. | |||||||||||
ACE | ACE 38 | 1975 | OPERATIONS | Engineering Resource Management for major works | John Sinclair | OSG | |||||||||
ACE | ACE 40 | 1975 | OPERATIONS | On-line applications of computers | John Sinclair | OSG | |||||||||
ACE | ACE 41 | 1975 | SUBSTATION | Guide to an ERA code of practice for the avoidance of interference with electronic instrumentation and systems | Ian Naylor | ASG | |||||||||
ACE | ACE 42 | 1978 | SUBSTATION | An investigation into new concepts of design for unit substations | Ian Naylor | ASG | |||||||||
ACE | ACE 43 | 1977 | SUBSTATION | Circuit coding systems | Ian Naylor | ASG | |||||||||
ACE | ACE 44 | CABLES | Report on Pulling-in aluminium-sheathed cable | Ian Naylor | ASG | ||||||||||
ACE | ACE 44 | CABLES | Part 1 (1975): 11kV belted corrugated type | Ian Naylor | ASG | ||||||||||
ACE | ACE 44 | CABLES | Part 2 (1978): 11kV screened corrugated type, 11kV smooth-side type and Consac cable | Ian Naylor | ASG | ||||||||||
ACE | ACE 47 | 1975 | OVERHEAD LINES | Overhead line wood pole requirements and alternative forms of overhead line supports | Ian Naylor | ASG | |||||||||
ACE | ACE 48 | 1977 | OPERATIONS | EHV or HV supplies to induction furnaces | Ian Naylor | ASG | |||||||||
ACE | ACE 49 | 1981 | OPERATIONS | Statistical method for calculating demands and voltage regulations on LV radial distribution systems | Ian Naylor | ASG | |||||||||
ACE | ACE 54 | 1977 | HV SWITCHGEAR | Report on Auto-reclosing schemes for 11kV distribution networks | Ian Naylor | ASG | |||||||||
ACE | ACE 55 | 1977 | PROTECTION | Report on lightning protection for networks up to 132kV | Ian Naylor | ASG | |||||||||
ACE | ACE 57 | 1977 | CABLES | Guide to mechanical aids used for cable laying and overhead line erection | Ian Naylor | ASG | |||||||||
ACE | ACE 58 | 1977 | OPERATIONS | Compensators for arc furnaces | John Sinclair | OSG | |||||||||
ACE | ACE 59 | 1977 | HV SWITCHGEAR | Report on 132kV delayed auto-reclosing schemes | Ian Naylor | ASG | |||||||||
ACE | ACE 60 | 1978 | SAFETY | Safety belts, harnesses and associated equipment | |||||||||||
ACE | ACE 62 | 1978 | OPERATIONS | The calculation of reactance variation and safe loading limits for large supply transformers | John Sinclair | OSG | |||||||||
ACE | ACE 63 | 1978 | CABLES | Short-circuit tests on 11kV extruded insulation cables | Ian Naylor | ASG | |||||||||
ACE | ACE 64 | 1980 | CABLES | Thermo-mechanical performance of supertension cables and accessories | Ian Naylor | ASG | |||||||||
ACE | ACE 68 | 1979 | GENERAL | Code of practice on the guarding of
roadworks WITHDRAWN |
WITHDRAWN | ||||||||||
ACE | ACE 73 | 1979 | OPERATIONS | Limits for harmonics in the UK Electricity Supply Industry | John Sinclair | OSG | |||||||||
ACE | ACE 76 | 1980 | TRANSFORMERS | Clarification of transformer ratings | Ian Naylor | ASG | |||||||||
ACE | ACE 77 | 1980 | SUBSTATION | The application of computer based equipment in transmission and distribution substations | Ian Naylor | ASG | |||||||||
ACE | ACE 78 | 1980 | OPERATIONS | Voltage control facilities on the distribution network | John Sinclair | OSG | |||||||||
ACE | ACE 78 | 1980 | OPERATIONS | Part 1 (1980): Background information and theory | John Sinclair | OSG | |||||||||
ACE | ACE 78 | 1980 | OPERATIONS | Part 2 (1980): User document for computer program | John Sinclair | OSG | |||||||||
ACE | ACE 82 | 1982 | CABLES | Pole mounted and other 11kV cable terminations using heat shrinkable components | Ian Naylor | ASG | |||||||||
ACE | ACE 84 | 1984 | OVERHEAD LINES | Report on the bleeding of creosoted poles | Ian Naylor | ASG | |||||||||
ACE | ACE 85 | 1981 | METERING | Magnetic tape recorders for tariff
metering WITHDRAWN |
WITHDRAWN | None | |||||||||
ACE | ACE 86 | 1983 | TRANSFORMERS | Report on HV fuse links for the protection of ground mounted distribution transformers | Ian Naylor | ASG | |||||||||
ACE | ACE 88 | 1983 | OPERATIONS | Report on RUNRALE computer program for radial high voltage distribution system design | John Sinclair | OSG | |||||||||
ACE | ACE 90 | 1982 | TELECOMMUNICATION | Report on the protection of Post Office lines against power system induction and rise of earth potential | Ian Naylor | ASG | |||||||||
ACE | ACE 92 | 1984 | SAFETY | Report on the training of telecommunication engineers | |||||||||||
ACE | ACE 98 | 1985 | CABLES | Notes of guidance for witnesses to sample testing on 33kV paper insulated, screened, lead sheathed, armoured and served multi- core cable, supplied generally in accordance with BS 6480 | Ian Naylor | ASG | |||||||||
ACE | ACE 104 | 1986 | OVERHEAD LINES | Report on the derivation of overhead line ratings applicable to high voltage distribution systems | Ian Naylor | ASG | |||||||||
ACE | ACE 105 | 1986 | OPERATIONS | Report on the design of low voltage underground networks for new housing | John Sinclair | OSG | |||||||||
ACE | ETR 99 | 1987 | OPERATIONS | Report on a UK survey to determine changes of harmonic voltage distortion in housing estate networks from December 1979 - January 1985 | John Sinclair | OSG | |||||||||
ACE | ETR 106 | 1990 | HV SWITCHGEAR | Part 2: Remedial measures for 11kV outdoor groundmounted switchgear | Ian Naylor | ASG | |||||||||
ACE | ETR 110 | 1989 | CABLES | Report on test procedures to determine the capability of cable screens to withstand fault currents from internal failures | Ian Naylor | ASG | |||||||||
ACE | ETR 111 | 1991 | OVERHEAD LINES | High voltage single circuit overhead lines on wood poles | Ian Naylor | ASG | |||||||||
ACE | ETR 112 | 1988 | OPERATIONS | Report on the harmonic impedance of supply systems | John Sinclair | OSG | |||||||||
ACE | ETR 113 | 1995 | OPERATIONS | Notes of guidance for the protection of embedded generating plant up to 5MW for operation in parallel with Public Electricity Suppliers’ Distribution Systems | John Sinclair | OSG | |||||||||
ACE | ETR 114 | 1988 | OVERHEAD LINES | Report on mechanical protection for porcelain insulators -an edge forward | Ian Naylor | ASG | |||||||||
ACE | ETR 116 | 1989 | OPERATIONS | Report on voltage unbalance due to British Rail AC traction supplies | John Sinclair | OSG | |||||||||
ACE | ETR 118 | 1989 | CABLES | Report of the fault current rating of "Pigtail" terminations of wire screens on cables | Ian Naylor | ASG | |||||||||
ACE | ETR 120 | 1995 | OPERATIONS | Calculation of fault currents in three-phase AC power systems (Application Guide to Engineering Recommendation G74 | John Sinclair | OSG | |||||||||
ACE | ETR 122 | 2002 | OPERATIONS | Guide to the application of Engineering Recommendation G5/4 in the assessment of harmonic voltage distortion and connection of non-linear equipment to the electricity supply system in the UK | John Sinclair | OSG | |||||||||
EAER c | G18 | 1974 | GENERAL | Operation of air break isolating switches: recommendations | John Sinclair | OSG | |||||||||
EAER c | G24 | 1975 | GENERAL | Code of practice for the safe operation of ground-mounted dependent manual closing oil switches and oil circuit breakers at 11kV & 6.6kV | John Sinclair | OSG | |||||||||
EAER c | G25 | 1975 | GENERAL | Future policy on dependent manual oil switches | John Sinclair | OSG | |||||||||
EAER c | G34 | 1979 | GENERAL | Procedure to obtain Post Office permission to attach telecommunication equipment to Post Office maintained plant | |||||||||||
EAER c | G35 | 1978 | GENERAL | Precautions to be taken by persons working in the vicinity of overhead lines on construction sites | |||||||||||
EAER c | G36 | 1978 | GENERAL | Procedure for dealing with complaints of radio and television interference | |||||||||||
EAER c | G42/1 | 1983 | GENERAL | Overhead lines in the vicinity of
recreational sites WITHDRAWN |
WITHDRAWN | TS 43-90 | |||||||||
EAER c | G43/3 | 2002 | GENERAL | Instructions for reporting to the National Fault and Interruption Reporting Scheme | John Sinclair | OSG | |||||||||
EAER c | G44 | 1980 | GENERAL | Mandatory procedure for the co-ordination of power line carrier system frequencies | John Sinclair | OSG | |||||||||
EAER c | G45/1 | 1983 | GENERAL | Notes of guidance for Electricity Boards on the use of irrigators, slurry guns and high pressure hoses in the vicinity of overhead lines | John Sinclair | OSG | |||||||||
EAER c | G46 | 1981 | GENERAL | The maintenance of electrical plant and equipment up to and including 132kV | John Sinclair | OSG | |||||||||
EAER c | G48 | 1981 | GENERAL | Remedial measures for Enfield 132kV gas compression cable sealing ends | |||||||||||
EAER c | G50 | 1986 | GENERAL | Maintenance of 132kV gas compression sealing ends | John Sinclair | OSG | |||||||||
EAER c | G51 | 1981 | GENERAL | Guidance notes on control of access to high voltage compounds with disconnectors used in the fault interfering mode | John Sinclair | OSG | |||||||||
EAER c | G53 | 1982 | GENERAL | Radio communications in an emergency - system design and operational recommendations to achieve maximum reliability and flexibility | John Sinclair | OSG | |||||||||
EAER c | G54 | 1982 | GENERAL | Operational procedures for helicopter use within the ESI | John Sinclair | OSG | |||||||||
EAER c | G55/1 | 2000 | GENERAL | The avoidance of danger from overhead electric lines and underground electric cables in forests and plantations | John Sinclair | OSG | |||||||||
EAER c | G56/1 | 1966 | GENERAL | Arrangements for access by EA Member Company staff to Railtrack Infrastructure | John Sinclair | OSG | |||||||||
EAER c | G57 | 1983 | GENERAL | Cable laying on agricultural land | John Sinclair | OSG | |||||||||
EAER c | G58/1 | 1986 | GENERAL | Purchase, use, storage, inspection and maintenance of hand held insulated tools for live working up to 1000 volts. WITHDRAWN | WITHDRAWN | G58/2 | |||||||||
EAER c | G60/1 | 1988 | GENERAL | Notes of guidance for Electricity Boards relating to the Telecommunications Act 1984. WITHDRAWN | WITHDRAWN | ||||||||||
EAER c | G62 | 1985 | GENERAL | Operational safety when working in the vicinity of live high voltage overhead lines | |||||||||||
EAER c | G63 | 1988 | GENERAL | Purchase, use, storage, inspection and testing of rubber gloves for electrical purposes | |||||||||||
EAER c | G65 | 1986 | GENERAL | Procedures for the procurement and management of Electricity Supply Industry representatives on the activities of the British Standards Institution. WITHDRAWN (Superseded by EA Guidelines) | |||||||||||
EAER c | G68 | 1988 | GENERAL | The fault performance non-auto-reclosing oil circuit-breakers intended for 11kV (250MVA) underground distribution networks | John Sinclair | OSG | |||||||||
EAER c | G70 | 1989 | GENERAL | Vegetation control near overhead lines | John Sinclair | OSG | |||||||||
EAER c | G71 ( | 1989 | GENERAL | Purchase, storage, use, inspection and maintenance of insulating mats for electrical purposes up to 650V | |||||||||||
EAER c | G72 | 1991 | GENERAL | Operational requirements for SF6 Switchgear under loss of pressure conditions | John Sinclair | OSG | |||||||||
EAER c | G73 | 1992 | GENERAL | Code of practice for the transfer of staff between Regional Electricity Companies and other companies under emergency conditions | John Sinclair | OSG | |||||||||
EAER c | R1/5 | 1999 | GENERAL | Notification of dangerous and potentially dangerous incidents and suspensions of operational practices | John Sinclair | OSG | |||||||||
EAER c | M9 | 1956 | METERING | The use of two-element three-phase
four-wire meters. WITHDRAWN |
WITHDRAWN | None | |||||||||
EAER c | M11/1 | 1970 | METERING | Standardisation of accuracy requirements for new meters. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER c | M13 | 1959 | METERING | Allocation code for meter maintenance. WITHDRAWN | WITHDRAWN | None | |||||||||
EAER c | M25/1 | 1988 | METERING | Improving the security of meters and associated service equipment | |||||||||||
EAER c | M28 | 1988 | METERING | Consumers' attachments to Boards' meters | |||||||||||
EAER c | M29 | 1989 | METERING | Facilities offered to customers from Area Board metering equipment | |||||||||||
EAER c | P1/3 | 1969 | PLANNING | 275/33kV, 132/33kV and 132/11kV supply point transformers | John Sinclair | OSG | |||||||||
EAER c | P3/1 | 1977 | PLANNING | Load reduction by voltage adjustment | John Sinclair | OSG | |||||||||
EAER c | P4 | 1955 | PLANNING | Power factor improvement | John Sinclair | OSG | |||||||||
EAER c | P10 | 1965 | PLANNING | Voltage control at bulk supply points | John Sinclair | OSG | |||||||||
EAER c | P19 | 1979 | PLANNING | Procedure for the planning and design of 132kV systems | John Sinclair | OSG | |||||||||
EAER c | S33 | 1982 | HV SWITCHGEAR | Switchgear current ratings at reduced ambient temperature (excluding fuses) | Ian Naylor | ||||||||||
EAER c | S35 | 1987 | HV SWITCHGEAR | Remedial measures for 11kV outdoor groundmounted switchgear | Ian Naylor | OSG | |||||||||
EAER c | S36 | 1988 | SUBSTATION | Procedure to identify and record `Hot' substations | |||||||||||
EAER c | EB/BT.2 | 1996 | TELECOMMUNICATION | Conditions for British Telecom and Public Electricity Suppliers’ joint use of poles | Ian Naylor | ASG | |||||||||
EAER c | TELE.1 | 1983 | TELECOMMUNICATION | The Electricity Boards' practices for the design, installation, operation and maintenance of telecommunication systems | |||||||||||
EAER c | T8/6 | 1987 | TRANSFORMERS | The cost of losses for transformers used on distribution systems | Ian Naylor | ASG | |||||||||
EAER c | ALC1/3 (Feb - 1992) | 1992 | CABLES | 33kV mass impregnated paper-insulated cables and accessories | Ian Naylor | ASG | |||||||||
EAER c | ALC2/4 (Oct - 1991) | 1991 | CABLES | 33kV - 132kV inclusive gas pressure and oil-filled cables and accessories | Ian Naylor | ASG | |||||||||
EAER c | ALC3/4 (Oct - 1991) | 1991 | CABLES | 275kV and 400kV gas pressure and oil-filled cable systems | Ian Naylor | ASG | |||||||||
EAER c | ALC4/2 (Feb - 1991) | 1991 | CABLES | 11kV mass impregnated paper insulated cables having aluminium sheath | Ian Naylor | ASG | |||||||||
EAER c | ALC5/4 (Feb - 1992) | 1992 | CABLES | Joints for 600/1000 volt systems | Ian Naylor | ASG | |||||||||
EAER c | ALC6/1 (Feb - 1991) | 1991 | CABLES | 600/1000V Distribution and service cables | Ian Naylor | ASG | |||||||||
EAER c | ALC7/2 (Jan - 1996) | 1996 | CABLES | Type Approved & Established 66kV and 132kV XLPE cable systems | Ian Naylor | ASG | |||||||||
EAER c | ALC8/1 (Sept - 1992) | 1992 | CABLES | 11kV & 33kV polymeric insulated cable systems & accessories | |||||||||||
EAER c | ALC9/1 (Sept - 1992) | 1992 | CABLES | Schedule of type approved link boxes/pillars for 33-132kV, 275kV and 400kV systems | Ian Naylor | ASG | |||||||||
EAER c | ALL1/5 (Jan - 1996) | 1996 | CABLES | Overhead line fittings up to and including 132kV | Ian Naylor | ASG | |||||||||
EAER c | ALP1/6 (Apr - 1996) | 1996 | CABLES | Protection relays and systems. WITHDRAWN (Superseded by ALP 1/9) | Ian Naylor | ASG | WITHDRAWN | ALP 1/9 | |||||||
EAER c | ALP 1/7 | 1999 | CABLES | WITHDRAWN | WITHDRAWN | ALP 1/9 | |||||||||
EAER c | ALP 1/8 | 2000 | CABLES | WITHDRAWN | WITHDRAWN | ALP 1/9 | |||||||||
EAER c | ALP 1/9 | 2002 | CABLES | Engineering Equipment Lists:Protection | |||||||||||
EAER c | ALS1/11 (April - 1996) | 1996 | CABLES | HV and LV Switchgear | Ian Naylor | ASG | |||||||||
ACE c | ACE 29 | 1972 | PROTECTION | Field trials of experimental installations of transistorised overcurrent and earth fault relays on Electricity Board networks | Ian Naylor | ASG | |||||||||
ACE c | ACE 36 | 1974 | OVERHEAD LINES | 132kV single circuit wood pole construction already developed by British Electricity Boards | Ian Naylor | ASG | |||||||||
ACE c | ACE 45 | 1976 | OPERATIONS | Secure power supplies to equipment associated with on-line control systems | John Sinclair | OSG | |||||||||
ACE c | ACE 50 | 1976 | HV SWITCHGEAR | ESI experience with unfilled switchgear and transformer cable terminations (for 3-core 11kV paper-insulated cables) | Ian Naylor | ASG | |||||||||
ACE c | ACE 51 | 1979 | OPERATIONS | The applications of ER P2/5. Security of Supply | John Sinclair | OSG | |||||||||
ACE c | ACE 52 | 1977 | SUBSTATION | 132kV plant record systems | Ian Naylor | ASG | |||||||||
ACE c | ACE 53 | 1977 | OPERATIONS | Guide to the choice between diesel and petrol-engined vehicles for use by Area Electricity Boards | John Sinclair | OSG | |||||||||
ACE c | ACE 56 | 1977 | METERING | Survey of tariff time switches whilst in service | |||||||||||
ACE c | ACE 61 | 1978 | TRANSFORMERS | The cost of losses for transformers used on distribution systems | Ian Naylor | ASG | |||||||||
ACE c | ACE 65 | 1980 | HV SWITCHGEAR | Short-circuit tests on circuit-breakers intended for auto-reclose duty on 11kV (250MVA) distribution networks | Ian Naylor | ASG | |||||||||
ACE c | ACE 66 | 1980 | HV SWITCHGEAR | Report on the auto-reclosing capability of circuit-breakers intended for 11kV (250MVA) distribution networks | Ian Naylor | ASG | |||||||||
ACE c | ACE 67 | 1979 | OVERHEAD LINES | Reliability investment in radial hv distribution systems with overhead lines | John Sinclair | OSG | |||||||||
ACE c | ACE 69 | 1979 | TELECOMMUNICATION | Development of Post Office pilot systems of feeder protection to comply with new Post Office requirements | Ian Naylor | ASG | |||||||||
ACE c | ACE 70 | 1979 | SUBSTATION | Deterioration in service of surge diverters on systems up to and including 132kV | Ian Naylor | ASG | |||||||||
ACE c | ACE 72 | 1979 | TELECOMMUNICATION | Radio communication in the ESI for the 1980s | |||||||||||
ACE c | ACE 74 | 1980 | CABLES | Unfilled cable terminations on distribution transformers | Ian Naylor | ASG | |||||||||
ACE c | ACE 75 | 1980 | OVERHEAD LINES | Characteristics and performance of fuses for use on 11kV overhead lines | Ian Naylor | ASG | |||||||||
ACE c | ACE 79 | 1981 | SUBSTATION | Microprocessor-based AVC | Ian Naylor | ASG | |||||||||
ACE c | ACE 80 | 1981 | OPERATIONS | Guide to the maintenance of electrical plant and equipment up to and including 132kV (Section 30 revised 1989) | John Sinclair | OSG | |||||||||
ACE c | ACE 81 | 1981 | CABLES | Report on 132kV gas compression cable sealing end failures | Ian Naylor | ASG | |||||||||
ACE c | ACE 83 | 1981 | METERING | Report on the national sampling survey 1980/81 of two-rate domestic credit meters after 8/9 years service | |||||||||||
ACE c | ACE 87 | 1982 | OPERATIONS | Report on typical switching routines for the operation of 11kV distribution systems | John Sinclair | OSG | |||||||||
ACE c | ACE 89 | 1982 | TRANSFORMERS | Report on corrugated tank distribution transformers | Ian Naylor | ASG | |||||||||
ACE c | ACE 91 | 1982 | SUBSTATION | Report on anti-vandal shields for insulators | Ian Naylor | ASG | |||||||||
ACE c | ACE 93 | 1983 | OPERATIONS | Report on the analysis of reactive compensation schemes applied to a representative distribution system | John Sinclair | OSG | |||||||||
ACE c | ACE 94 | 1983 | CABLES | Optical fibres | |||||||||||
ACE c | ACE 95 | 1984 | OPERATIONS | Report on the testing of a small synchronous generator combined heat and power unit | John Sinclair | OSG | |||||||||
ACE c | ACE 96 | 1984 | METERING | Report on survey of faults in tariff time switches during the period 1 January - 31 December 1983 | |||||||||||
ACE c | ACE 97 | 1985 | OVERHEAD LINES | Report on use of home grown wood poles for overhead line supports | Ian Naylor | ASG | |||||||||
ACE c | ACE 100 | 1985 | METERING | Automatic meter testing | |||||||||||
ACE c | ACE 101 | 1985 | METERING | Equipment for metering and billing large consumers. WITHDRAWN | WITHDRAWN | None | |||||||||
ACE c | ACE 103 | 1985 | METERING | National sampling survey of two-rate domestic credit meters after 8/9 years' service - the performance of GEC C11B2-R meters | |||||||||||
ETR c | ETR 106 | 1987 | OPERATIONS | Part 1 Remedial measures for 11kV outdoor groundmounted switchgear | John Sinclair | OSG | |||||||||
ETR c | ETR 107 | 1987 | CABLES | Second report on optical fibres | |||||||||||
ETR c | ETR 109 | 1987 | OPERATIONS | Report on telecontrol in the ESI | John Sinclair | OSG | |||||||||
ETR c | ETR 115 | 1988 | OPERATIONS | Report on the computer program debut for the design of lv radial networks | John Sinclair | OSG | |||||||||
ETR c | OPERATIONS | Part 1 - Background information and theory | John Sinclair | OSG | |||||||||||
ETR c | OPERATIONS | Part 2 - Program user guide | John Sinclair | OSG | |||||||||||
ETR c | ETR 119 | 1991 | CABLES | Third report on optical fibres | |||||||||||